01 / 07

Public consultation

Have your say on

new homes in Bovey Tracey

This consultation is an opportunity to share your views and help inform the emerging proposals for new homes at land known as site RT2.

240
Homes
60
Affordable homes
2027
Planning application, early 2027

The following pages explain how the proposals have developed so far and how important site considerations, including the landscape and topography, ecology and access, have influenced the emerging design.

At the end of the consultation, you will have the opportunity to provide your comments and feedback on the proposals. We will ask for your name and home postcode, which will help us understand the views of people living in and around the local area and their proximity to the site.

Whilst the scheme is still being considered and designed, it is our intention that an Outline application for residential development will be submitted to Teignbridge District Council, which is the Local Planning Authority, early in 2027. 

Aerial view of Bovey Tracey with site RT2 outlined in red
Site plan showing the RT2 boundary on the eastern edge of Bovey Tracey

02 / 07

The site

Why is RT2 being considered for new homes?

RT2 has been considered as a potential location for new homes since 2021, when the site was put forward as part of the preparation of the new Teignbridge Local Plan.

Over the following years, the site was assessed through the Local Plan process, including consideration of matters such as landscape, ecology, access and infrastructure. This process resulted in the site being formally allocated for new homes under Policy RT2 of the Teignbridge Local Plan 2020–2040 in spring 2026.

The allocation of RT2 does not itself grant planning permission. A planning application still needs to be prepared, submitted and considered by the Council. This consultation forms part of that next stage, helping to inform how the proposals for RT2 are developed.

Policy requirements for and proposals at RT2

This allocation, in line with the Teignbridge Local Plan 2020–2040, is required to include:

01
At least 2.5 hectares of Green Infrastructure
02
25% of the homes to be Social Housing – 50% of these to be Social Rent, 25% Shared Ownership and the remaining 25% to be Discounted Market (such as First Homes)
03
Contributions towards education provision within Bovey Tracey
04
An appropriate Flood Risk Assessment to ensure that the development is safe and that it does not increase the risk of flooding elsewhere
05
A safe vehicular access onto the B3344
06
Provisions to ensure no harm to the South Hams Special Area of Conservation (SAC)
07
A design and layout that conserves or enhances the setting of Dartmoor National Park
08
Provision for archaeological investigation before development begins
09
On-site play areas
Early concept plan with higher density to the south, lower density on the northern slopes and the previous Employment Land in purple

Early concept designs for the site focused higher density development at the southern, lower side of the site, with lower density development on the northern, upper slopes (as shown through the lighter colours).

The previous ‘Employment Land’

The proposal will also make use of some additional land – shown in purple.

This land was previously earmarked for employment use under the former Local Plan 2013–2033 (as part of an allocation known as BT2) and did have planning permission for the use, although it was not implemented. However, the land in question does not now have any current status in the adopted Local Plan 2020–2040.

The land already benefits from an existing access, services and previous ground preparation. These new proposals seek to make use of this existing infrastructure and bring this currently unused area into the wider development.

03 / 07

community

Education and further benefits to the community

Devon County Council are currently in the process of planning the relocation and expansion of Bovey Tracey primary school. This process is still ongoing, but we are in touch with the Council and have informed them of the development’s anticipated timeframe for delivery (more on this later).

New development can help support improvements to local infrastructure and services, including education, through financial contributions secured as part of the planning process. These are secured via Section 106 agreements as well as the Community Infrastructure Levy (CIL). The RT2 proposals would make a significant contribution towards local infrastructure, helping to support the investment needed as Bovey Tracey grows, including the provision of additional education facilities.

04 / 07

shaping the design

The constraints and opportunities

Working through the spring, summer and autumn of 2026, various constraints and requirements were identified and surveyed, which have shaped and formed the design, namely:

Ecological constraints and opportunities plan

Ecological constraints

Initial framework layout plan

The initial Framework Layout Plan

Constraints

Bats were found to be present within the surrounding South Hams Special Area of Conservation (SAC) area using the site for foraging and commuting.
Potential cirl bunting territory within the site.
Mature hedgerows within and adjoining the site.
Rising topography to the north.
Mature trees in the centre of the site as well as on the perimeter.
Existing water mains in the south of the site.
Intervisibility from the northern high ground of the site toward Dartmoor National Park and vice versa.

Opportunities

The development could provide a new ‘dark corridor’ for commuting bats to the east of the development.
Existing hedgerows could be maintained and enhanced where possible, with suitable green buffer zones between them and any proposed housing.
Ability to use the current levels to inform and shape an organic layout design.
Mature trees to be incorporated into the design as part of open spaces and retained hedges.
Keep the denser part of the scheme lower down the slopes, using the higher elements as public open space to limit impact when seen from the National Park.
Potential for local shop space within the Development in the previous 'Employment Land'.

05 / 07

the proposals

Emerging layout

The illustrative layout is still undergoing some refinement, but the design is shaping up to look something like the plan below.

240
Homes, from 1 & 2 bed apartments up to 4 bed detached houses
60
Affordable homes
Local shop
Space within the previous ‘Employment Land’
2×
Around double the 2.5 ha Green Infrastructure requirement
Illustrative layout plan for RT2, Bovey Tracey
Illustrative CGI of new homes along a street within the proposed scheme
Illustrative CGI of children playing on open space in front of new homes
The planning application will be an outline planning application, meaning that the site layout plan is prepared to prove that the development is deliverable, but that it is illustrative.
The plan shows a total of 240 homes, ranging from 1 & 2 bed apartments, up to 4 bed detached houses.
There are set to be 60 affordable homes – 30 of these to be Social Rent, with the remaining 30 being split between Shared Ownership and First Homes, as per the requirements of the Local Plan.
Of the 180 Open Market homes, the plan shows 21% will be 2 beds (either apartments or 2 storey homes), 49% 3 beds and the remaining 29% 4 beds.
Local shop space within the previous ‘Employment Land’ is proposed to be provided at ground floor level, likely with some additional residential apartments above.
We have incorporated the adjoining land to the south west to provide another access point, as well as using the area to deliver a mix of apartments and a local shop across three separate blocks. These will be a mixture of Open Market and Affordable homes, which will present a much-needed boost to the housing stock within Bovey Tracey for those requiring smaller or starter homes, as well as a local convenience to serve both new development and existing neighbours.
The Allocation requires 2.5 hectares of Green Infrastructure (open spaces, habitats, hedges, etc.). The current plan shows around double that requirement.
A new dark corridor for commuting bats will be provided.
The scheme includes a cycleway along the whole southern edge, providing a safer route for bicycles away from the B3344. In future this could potentially be further extended towards Chudleigh Knighton, subject to landowner approval.
There will also be benefits to the wider existing community, namely accessible open space, and S106 and CIL contributions which are often used by the Council to fund local doctors, schools, open space, sport facilities as well as road and flood infrastructure.
On site provision of allotments

06 / 07

what happens next

Outline of next steps and timeline to submission

We are looking to submit an outline planning application within the next few months. An outline application establishes the principle and broad framework for development, with further details to be developed and agreed with the Council before construction can begin.

Subject to the necessary planning approvals, we currently anticipate that the first new homes could be ready for residents in early 2030. Development would then take place gradually, with around 40 new homes expected to be completed each year.

2021
Site put forward for the new Local Plan
Spring 2026
Allocated under Policy RT2
Spring–autumn 2026
Site surveys and constraints work
26 Nov – 23 Dec 2026
Public consultation
You are here
Early 2027
Outline planning application submitted
Early 2030
First homes ready, then around 40 a year

07 / 07

Proposal feedback

Have your say on the emerging scheme

We value the input and comments of local stakeholders and would appreciate your feedback below.

We are collecting names and postcodes to understand your proximity to the proposal.

Consultation runs Wednesday 26 November to Wednesday 23 December 2026

Do you live in Bovey Tracey? *
Do you work in Bovey Tracey? *
Is there an adequate provision of homes for first time buyers within the town? *
Would the provision of safe cycle links across the district reduce your reliance on a car? *
Do you feel the draft layout plan adequately addresses the site’s constraints? *
Do you think the proposed housing mix is appropriate? *
Would you be in favour of reducing road speed limits on the B3344 in the vicinity of the proposed development? *
Are you supportive of the inclusion of a local shop as part of the scheme? *
As a prospective new resident or existing neighbour, would you be interested in registering for an allotment on this scheme? *
Please rank the below items with a score of 1 to 5, with 1 being not important to me at all, and 5 being very important to me
Do you support this development in principle? *

Thank you, your response has been received.

Your feedback goes straight to the project team and will help shape the proposals for site RT2 before the planning application is submitted. If you’d like to add anything or change your answers, email rt2@roachplanning.co.uk.

Sorry, your response didn’t send. Please check the required questions and try again. If it still won’t send, email your answers to rt2@roachplanning.co.uk.